您已经添加该商品到您的收藏列表
从您收藏列表中删除此商品。
这家公司已成功添加。 查看我的收藏.
这家公司已从你的收藏夹列表中删除。
这家公司已被添加到您的询问车。
这家公司已从询价车中删除。
该商品已被添加到您的询问车。
该商品已经从您的询价车中删除。
商品/公司已达到添加至询价车的数量。
登入NEWPAGES
保持登入状态
每日登录奖励

恭喜! 你获得了今天的每日登录奖励!

5 NP Point这是您获得的奖励!
查看您的每日登录奖励

确保每天回来登入以获更多的奖励!
谢谢!

Back
Seni Jaya Logo
PQE Power System Sdn Bhd
PQE Power System Sdn Bhd (929054-P)
访客

On-site Transient Test for Generator & Load Bank Test

On-site Transient Test for Generator & Load Bank Test
How do we know our generator is working optimally?

To ensure a good generator condition, load bank test and transient test are applied on the generator. The load bank test is used to test that which UPS and generator is under load conditions to ensure that they are working optimally. While the transient test is used to detect drastic fluctuation in current or voltage on a device while connected to a power grid (also considered as transient). A device's susceptibility is determined through immunity testing, and transient generators are used to test the device's immunity to transients by simulating transients found in real-life situations.

This method is used to validate the true operational performance and battery autonomy of a UPS system. The primary reason for testing load banks is to perform necessary preventive maintenance to avoid future damages or breakdowns. Load bank tests, in addition to preventative maintenance, are used to determine the current conditions of UPS batteries as well as battery sets to show whether any of the cells are holding the charge, approaching the end of their working life, or about to fail.

Utilize your generator to the maximum by contacting PQE professionals via email at info@pqe.com.my.


如需咨询或问题,联系我们
总办事处

PQE Power System Sdn Bhd (929054-P)
C-10-01, Oasis Square, Jalan PJU 1A/7A, Ara Damansara, 47301 Petaling Jaya, Selangor, Malaysia.
Google Maps Waze

邮件: info@pqe.com.my
网址: https://www.pqe.com.my
网址: https://pqe.newpages.com.my/
网址: http://pqe.n.my/

Powered by NEWPAGES